CURRENT PROJECTS:

Urbana, San Diego, CA - Design and construction of 98-unit Type 3 project in downtown San Diego. 2 levels of below grade parking, with retail podium level, and 5 floors of wood framing above. Total cost of project $27 million.

Desmond’s Tower, Los Angeles, CA – Design and construction of 175-unit Type 3 project on Wilshire Blvd. 3 levels of below grade parking, with 2 levels of Type 1 above grade, and 5 floors of wood framing above the podium deck. Total cost of project $49 million.

Erma Road, San Diego, CA – Design and construction of 114-unit slab-on-grade project in Scripps Ranch. 100% solar-powered including high-tech units with GE home area networks. Total cost of project $29 million.

SanTan Village, Gilbert, AZ - Design and construction of 382-unit slab-on-grade project in Phoenix. Total cost of project $44 million.


Construction Management
Ph: 949.439.0248
AboutCurrent ProjectsCompleted ProjectsContact Us